Free Resource
5S Audit Checklist: 25 Questions, a Scoring Sheet and a Free Template
The full list of 5S audit questions, five per pillar, with a simple 0 to 4 scoring sheet, a worked example, and swaps for warehouse, office, and production areas. Use the questions straight off this page, or download the print-ready PDF free below.
On this page: 25 audit questions · scoring · scored example · how often · warehouse and office · FAQ
What a 5S audit is
5S is a workplace organization method that keeps a work area clean, ordered, and standardized so problems are easy to see and easy to fix. A 5S audit is the regular check that tells you whether the system is holding. Instead of a vague walk-through, the auditor rates each area against clear criteria, writes down what they find, and assigns owners and due dates for anything below standard.
Done well, a 5S audit is short, repeatable, and honest. The same area is scored the same way every time, so the trend line tells the real story. A single high score is nice. A score that climbs and then stays up is the goal.
The 5 pillars of 5S
The audit checklist scores one section per pillar. Here is what each pillar is asking you to verify.
- Sort (Seiri). Only what is needed is in the area. Unneeded tools, materials, and paperwork have been red tagged and removed. Nothing is stored "just in case."
- Set in Order (Seiton). Everything that remains has a marked home. Shadow boards, labels, and floor markings make it obvious where each item belongs and when one is missing.
- Shine (Seiso). The area is clean and cleaning is part of the routine, not a special event. Cleaning doubles as inspection: leaks, wear, and damage get caught early.
- Standardize (Seiketsu). The first three pillars are written down as a visual standard so any shift can hold them. Responsibilities and frequencies are clear and posted.
- Sustain (Shitsuke). The standard holds without a manager standing over it. Audits happen on a set cadence, results are posted, and gaps get closed.
25 5S audit questions (5 per pillar)
Score each question 0 to 4 as you walk the area, then average the five answers for that pillar's score. Write one specific example next to any question scored 2 or lower, so the follow-up action is obvious.
Sort (Seiri)
- Are only the tools, materials, and supplies needed for current work present in the area?
- Are unneeded items red tagged or already removed, with nothing stored "just in case"?
- Is the red tag holding area in use, with every tagged item dated and inside its holding period?
- Are personal items kept out of the work area or in their designated spot?
- Are aisles, walkways, and exits free of excess material, pallets, and scrap?
Set in Order (Seiton)
- Does every tool, fixture, and supply have a marked, labeled home?
- Can anyone tell at a glance when an item is missing (shadow boards, outlines, labels)?
- Are floor markings for walkways, WIP, and storage in place and clearly visible?
- Are the most frequently used items stored closest to the point of use?
- Are minimum and maximum levels shown for consumables and supplies?
Shine (Seiso)
- Are floors, benches, and equipment free of dirt, oil, chips, and debris?
- Is a cleaning schedule with owners posted, and is it being followed?
- Are cleaning supplies stocked and stored in their designated location?
- Are leaks, loose guards, worn parts, or damage found during cleaning reported and tagged?
- Are trash, scrap, and recycling containers emptied before they overflow?
Standardize (Seiketsu)
- Is a visual standard (photo or layout) posted showing what "right" looks like for this area?
- Are 5S tasks and frequencies assigned by name or role and posted?
- Are labels, colors, and floor markings consistent with the rest of the facility?
- Are daily 5S checklists available at the point of use and being filled in?
- Could someone from another shift hold the area to standard using only what is posted?
Sustain (Shitsuke)
- Is the last 5S audit result posted in the area, with the trend visible?
- Were the follow-up actions from the last audit closed by their due dates?
- Do team members complete daily 5S tasks without being reminded?
- Is the 5S audit happening on its scheduled cadence?
- Has the area held or improved its score over the last three audits?
How 5S scoring works
This 5S audit template uses a 0 to 4 score per pillar, which keeps ratings fast and consistent across auditors:
- 0: No system in place. The pillar is not being practiced.
- 1: A few examples exist, but the area is mostly uncontrolled.
- 2: The basics are in place but inconsistent. Gaps are easy to find.
- 3: The standard is met across the area, with minor exceptions.
- 4: The standard is met and self-sustaining. The area would pass unannounced.
Add the five pillar scores for a total out of 20, then convert to a percentage to trend the area. A practical first target is 70 percent (14 of 20), with a clear path to 90 percent. The number matters less than the direction: each audit should leave behind a short list of dated follow-up actions, and the next audit should confirm they were closed.
Red tag rules to include
Red tagging is how the Sort pillar stays objective. During the audit, any item whose need is in question gets a red tag instead of an argument. A few rules keep it clean:
- Tag the item with the date, who tagged it, and why its need is unclear.
- Move tagged items to a marked red tag holding area, not back to the bench.
- Set a holding period, commonly 30 days. If no one claims a need, the item leaves the area.
- Log every tag so the pattern is visible. Repeat clutter points to a process gap, not a people gap.
How to run the audit in 15 minutes
- Pick the area and the standard. Audit against the posted visual standard, not your memory of it.
- Walk the five pillars in order. Score each on the 0 to 4 scale and note one specific example.
- Red tag anything questionable as you go. Do not stop to debate it.
- Total the score, convert to a percentage, and write down two or three follow-up actions with owners and dates.
- Post the result where the team can see it, then verify the actions at the next audit.
Example: a scored 5S audit check sheet
Here is what a finished audit looks like for a packaging cell on its third weekly audit.
| Pillar | Score (0 to 4) | What the auditor saw |
|---|---|---|
| Sort | 3 | Two unused fixtures under the bench, both red tagged. |
| Set in Order | 2 | Shadow board missing outlines for three hand tools. |
| Shine | 3 | Clean, but the cleaning schedule was not initialed for two days. |
| Standardize | 2 | No layout photo posted for the cell. |
| Sustain | 1 | Two of three actions from last week are still open. |
| Total | 11 of 20 | 55 percent, up from 45 percent last week. |
Follow-up actions, each with an owner and a date:
- Add the three missing shadow board outlines. Cell lead, by Wednesday.
- Take and post a layout photo of the cell at standard. Supervisor, by Friday.
- Close last week's two open actions before the next audit. Cell lead, by next Monday.
How often to run a 5S audit, and who runs it
- Weekly, per area: the area supervisor or team lead, about 15 minutes, same day each week.
- Monthly cross-audit: someone from a different area scores it with fresh eyes. Big gaps between their score and the weekly score are worth a conversation.
- Quarterly walk: the plant or operations manager walks the worst and best scoring areas and asks what is getting in the way.
Rotate auditors so no one grades their own homework for long, and keep the same questions so the trend line means something.
Adapting the checklist for warehouse, office, and production areas
Keep the five pillars and the scoring. Swap a few questions so they fit the area.
- Warehouse: Are racks and bin locations labeled and readable from the aisle? Are pallet staging lanes marked and used? Are forklift paths clear? Is the dock free of empty pallets and wrap?
- Office: Do shared folders follow an agreed structure? Are supply cabinets labeled with minimum levels? Is the printer area and meeting room reset after use?
- Production: Are fixtures and changeover parts on carts or shadow boards? Are gauges stored at the point of use? Are chips and coolant cleaned up at the end of each shift?
Get the free 5S Audit Checklist
Enter your email and the checklist opens on the next page. We send the occasional shop-floor template after that. Unsubscribe anytime.
What is in the free download
The PDF is a complete, print-ready 5S audit toolkit you can use on the floor today:
- A one-page 5S audit checklist with scored criteria for all five pillars.
- The 0 to 4 scoring scale and a total-to-percentage conversion guide.
- A red tag rules reference and a simple red tag log layout.
- A follow-up action tracker so findings turn into closed gaps.
It is fully generic. There are no logos to remove and no software to install. Print it, clip it to a board, and adapt the criteria to your own area and standards.
Already on the list? Download the PDF directly.
5S audit FAQ
What is a 5S audit?
A 5S audit is a structured walk of a work area that scores how well the five pillars are being held: Sort, Set in Order, Shine, Standardize, and Sustain. The auditor rates each pillar against clear criteria, records findings, and assigns follow-up actions so the area improves week over week.
What questions are on a 5S audit checklist?
A good 5S audit checklist asks about five questions per pillar: whether only needed items are present (Sort), whether everything has a marked home (Set in Order), whether the area is clean and cleaning is routine (Shine), whether a visual standard is posted and owned (Standardize), and whether the audit cadence and follow-up actions are holding (Sustain). The 25 questions on this page are a ready-to-use set.
How do you score a 5S audit?
Most 5S scoring uses a 0 to 4 scale per pillar, where 0 means no system is in place and 4 means the standard is met and self-sustaining. Add the five pillar scores for a total out of 20, then convert to a percentage to trend the area over time.
How often should you do a 5S audit?
Weekly for each area is a practical default, run by the area supervisor or team lead and kept to about 15 minutes. Add a monthly cross-audit by someone from a different area for fresh eyes, and rotate auditors so the scores stay honest.
What is a good 5S audit score?
A practical first target is 70 percent (14 of 20 on a 0 to 4 scale), with a path to 90 percent. The direction matters more than any single score: an area that climbs and then holds is doing better than one that spikes once before a visit.
Is there a 5S audit checklist for a warehouse or an office?
Yes. Keep the five pillars and the scoring, then swap in area-specific questions: rack and aisle labeling, pallet staging lanes, and dock clutter for a warehouse; shared folders, supply cabinets, and common areas for an office. Examples are listed on this page.
What is a red tag in 5S?
A red tag is a label placed on any item whose need is in question during the Sort step. Tagged items move to a holding area for a set period. If no one needs the item before the deadline, it is removed, returned, or disposed of, which keeps the work area free of clutter.
Ready to roll it out across the floor?
The free checklist gets one area audited. When you are ready to run 5S as a weekly habit across the whole floor, these editable templates build on it. Start small with a single area, prove the habit, then scale it.